Monitoring and Control

Increasing efficiency of the Electrical Command Center Project

Increasing efficiency of the Electrical Command Center Project

PEA implemented the SCADA/TDMS system according to the increasing the efficiency of the Electrical Command Center system project by using Schneider Electric's ADMS software to replace the SCADA/DMS system and by using ADMS technology that can analyze and support Electricity distribution with DERs (Distributed Energy Resources) distributed in the transmission and distribution systems. Let the center staff control the power supply can control the power system to be stable. Effectively provide stability and safety to electricity users in PEA's service area. Supports expansion of scope to focus on future changes, such as becoming a Distribution System Operator (DSO) to support the transition to the free electricity system in the future.



image1

"SMART ENERGY FOR BETTER LIFE AND SUSTAINABILITY"

For the ADMS platform, it is a technology related to the control of electricity distribution helps increase efficiency of the power distribution command center system, and it is one of the technologies that are the driving force towards becoming a Digital Utility according to our vision

image2

OJT & Training

image3

Main Function System

  • SCADA (common platform for DMS and EMS functions)
  • ICCP per IEC60870-6 TASE.2 (for EGAT and OMS data exchange)
  • Load Shedding and Restoration (Fixed & Rotational)
  • Switching Management System
  • Information Storage and Retrieval (RDBMS)
  • Load Forecast/Generation Forecast
  • State Estimation
  • Power Flow
  • Contingency Analysis
  • Optimal Power Flow
  • Fault Level Analysis
  • Open Conductor Fault Detection
  • Optimal Feeder Reconfiguration
  • Fault Locator
  • Fault Location, Isolation, and System Restoration (Self-Healing DA function)
  • Volt/Var Control (loss minimization, conservation voltage reduction)
  • Operations Simulator (DTS/OTS)
image4
image5

Power Applications

  • Switching Management (planned works)
  • FLISR
  • Load Shedding
  • Basic UI features
  • EMS Load Flow and State Estimation
  • DMS Load Flow and State Estimation
  • Basic reports
  • Simulation environment
  • EMS advanced applications
  • DMS advanced applications
  • Historical applications
  • DERMS
  • WebDMD functionality overview

image6 image7 Improving the efficiency of power station control and protection systems Project

Improving the efficiency of power station control and protection systems Project

To replacement of control and protection system equipment at power stations. That has a lifespan of control and protection system equipment of more than 10 years to provide control and protective equipment at power stations Can be used effectively Maintain the stability of the electrical system at all times. Reduce power outages due to deteriorate equipment, improve control and protection systems at power stations. To be more modern (according to IEC 61850 standards) to support Unmanned Substation and Smart Grid policies.



Control Room

Control Room

Switchgear Room

Switchgear Room

115 kV SPCS

115 kV SPCS

SPCS Architecture according to IEC61850

SPCS Architecture according to IEC61850

image11a
image11b
image11c
image11d